Enter your TESCO units and pick your consumer type. With the current adjustments, 100 units on a 1 kW connection costs about Rs 927 on the lifeline tariff, Rs 1,744 if protected and Rs 3,588 if unprotected.
TESCO is the Tribal Electric Supply Company, serving the merged tribal districts of Khyber Pakhtunkhwa. It bills homes on the same national uniform tariff as every other company.
Three bills for the same 100 units
At low use, your consumer type decides almost everything.
| Consumer type | Rate | Fixed charge (1 kW) | Estimated bill |
|---|---|---|---|
| Lifeline | Rs 7.74 on all 100 units | none | Rs 926.61 |
| Protected | Rs 10.54 | Rs 200 | Rs 1,744.05 |
| Unprotected | Rs 22.44 | Rs 275 | Rs 3,587.90 |
Lifeline homes also skip the fuel adjustment and the quarterly adjustment. They do not pay the FC surcharge either. Protected homes pay it at Rs 0.43 a unit and unprotected homes at Rs 3.23.
Worked example: 100 units, protected, 1 kW
| Line | Working | Amount |
|---|---|---|
| Cost of electricity | 100 × 10.54 | Rs 1,054.00 |
| Fixed charges | 1.0 kW × Rs 200 | Rs 200.00 |
| FC surcharge | 100 × 0.43 | Rs 43.00 |
| Quarterly adjustment | 100 × 0.5194 | Rs 51.94 |
| Fuel adjustment | 100 × 1.1086 | Rs 110.86 |
| Electricity charges | Rs 1,459.80 | |
| Electricity duty | 1.5% of cost of electricity and QTA | Rs 16.59 |
| GST | 18% of the charges above and duty, rounded | Rs 246.00 |
| Duty on fuel adjustment | 1.5% of the fuel adjustment | Rs 1.66 |
| GST on fuel adjustment | 18% of the fuel adjustment and its duty, rounded | Rs 20.00 |
| Government charges | Rs 284.25 | |
| Total | Rs 1,744.05 |
Who qualifies for lifeline and protected
- Lifeline: single-phase connection, sanctioned load up to 1 kW, and no more than 100 units a month. Lifeline users get no slab benefit: 80 units are billed at Rs 7.74 each, not at Rs 3.95 for the first 50.
- Protected: 200 units or less in each of the last six months.
- Unprotected: everyone else.
If a lifeline home uses more than 100 units, the calculator moves it to unprotected rates.
Electricity duty and reading your bill
The merged districts are part of Khyber Pakhtunkhwa. Electricity duty does not appear on every TESCO home bill, so match the duty box to your bill.
You need the units consumed and the sanctioned load in kW from your bill. If your bill is based on an estimated reading rather than a meter reading, the calculator can still show what those units should cost.
TESCO's neighbours bill on the same national tariff: the PESCO bill calculator and the HAZECO bill calculator.
Protected TESCO bill by units
Protected TESCO home, 2 kW load, current adjustments, duty included.
| Units | Cost of electricity | Estimated total bill |
|---|---|---|
| 50 | Rs 527 | Rs 1,226 |
| 100 | Rs 1,054 | Rs 1,980 |
| 150 | Rs 1,705 | Rs 3,117 |
| 200 | Rs 2,355 | Rs 4,021 |
For a wider range, try the electricity bill calculator.
This estimate comes from qaaf, an independent site with no link to TESCO or NEPRA. It does not include arrears, instalments, late payment surcharge or a billing period longer than usual. Pay the amount on your TESCO bill.
Questions people ask
What is the lifeline electricity rate in 2026?
Rs 3.95 per unit for up to 50 units, and Rs 7.74 per unit for 51 to 100 units, under the February 2026 NEPRA tariff. All units are charged at the rate of the slab you land in. There is no fixed charge and no fuel or quarterly adjustment.
How much is a 100 unit TESCO bill?
About Rs 927 on the lifeline tariff, Rs 1,744 if protected and Rs 3,588 if unprotected, on a 1 kW connection with the current adjustments with duty included. The electricity bill calculator compares 100 unit bills in more detail.
Is the TESCO tariff different from PESCO?
No. TESCO, PESCO, HAZECO and the other companies all charge the same national uniform tariff notified in February 2026. The fuel and quarterly adjustments are set in the same NEPRA decisions for all of them.
Do lifeline users pay GST?
Yes. GST at 18% is charged on the cost of electricity and any duty, even on a lifeline bill. For 100 lifeline units that is about Rs 141.
Last reviewed 9 October 2026. Results are estimates; official notices always take precedence.